z-adamson
Addicted Member
When you have a spec and measurement instructions, sometimes it will also say WHEN to check it.
For example, "2mvdc at test points.....take measurement 2 minutes after start up because as the amp continues to warm up the measurement will be higher".
And other times it will just say "2mvdc at test points". No mention of how much run time before measuring. In this case, do you wait till the amp is 100% up to temp? Do you measure right after firing up? 5 min after start up?
For example, "2mvdc at test points.....take measurement 2 minutes after start up because as the amp continues to warm up the measurement will be higher".
And other times it will just say "2mvdc at test points". No mention of how much run time before measuring. In this case, do you wait till the amp is 100% up to temp? Do you measure right after firing up? 5 min after start up?