dnewma04
The Healer
Made a little progress this afternoon.
I cut the front baffle to allow the shelf bracing to slide in and did a little test fitting. Alignment seems very good, better than I expect without a doubt.
Then I cut the shelf bracing which still needs to be opened up and on the top one, recessed for the driver. Which is about 9" deep. I also need to work out the vertical bracing scheme and get that added, then it will be time to start thinking about assembly.
I cut the front baffle to allow the shelf bracing to slide in and did a little test fitting. Alignment seems very good, better than I expect without a doubt.
Then I cut the shelf bracing which still needs to be opened up and on the top one, recessed for the driver. Which is about 9" deep. I also need to work out the vertical bracing scheme and get that added, then it will be time to start thinking about assembly.