10 years ago, we had a 1,200 ft addition built onto our house.
I installed a new 200 amp panel and meter box on the addition which became the main breaker panel and ran a huge romex wire (100 amp rated) from it to the old main box in the garage which then became a sub-panel after the electric company moved the drop from it to the new box.
I ran all of the wiring to all of the outlets and lights, including a sub-panel with breakers in the shop.
Took photos of all of the wiring before the drywall went up. That becomes handy when hanging things on a wall, so fasteners don't hit any wiring.
I drew up a map which shows which outlets and lights are on each breaker and it lives on the front panel of the box.
Did the same for the original part of the house, including the gauge romex used so that the proper sized breaker was used.
There had been a few questionable wire gauge things happening from a previous electrician which I corrected.
Installed wired smoke detectors at the same time which was code in the addition.
All with a permit and inspected.
At the time, I was lucky enough to have an electrician friend who lived next door and guided me through the process, and helped me install the new meter box, drop and panel.
Passed inspection with flying colors.
I did a lot of the other work on the addition which involved 2 other permits and inspectors.
I overheard one inspector saying to another "yea, this is fine, overbuilt like everything else."
I installed a new 200 amp panel and meter box on the addition which became the main breaker panel and ran a huge romex wire (100 amp rated) from it to the old main box in the garage which then became a sub-panel after the electric company moved the drop from it to the new box.
I ran all of the wiring to all of the outlets and lights, including a sub-panel with breakers in the shop.
Took photos of all of the wiring before the drywall went up. That becomes handy when hanging things on a wall, so fasteners don't hit any wiring.
I drew up a map which shows which outlets and lights are on each breaker and it lives on the front panel of the box.
Did the same for the original part of the house, including the gauge romex used so that the proper sized breaker was used.
There had been a few questionable wire gauge things happening from a previous electrician which I corrected.
Installed wired smoke detectors at the same time which was code in the addition.
All with a permit and inspected.
At the time, I was lucky enough to have an electrician friend who lived next door and guided me through the process, and helped me install the new meter box, drop and panel.
Passed inspection with flying colors.
I did a lot of the other work on the addition which involved 2 other permits and inspectors.
I overheard one inspector saying to another "yea, this is fine, overbuilt like everything else."