Ok, here is a brief history of the last couple of months, and some reasons behind my tardiness. In november, I ordered two sets of baffles and promptly destroyed both by not double checking my measurements on the fixture I made. Amateurish mistake number one. So, rather thn having two sets ready to go, I just threw away a good chunk of money on a stupid mistake.
About that time, we found out that Liberty would require surgery on a small cyst she developed on her face. That essentially took out 2-3 weeks of available time and the holidays hit. During the holidays, we learned that my wife might need reconstructive foot surgery and she needed to stay off of her feet for a while to see if some issues would correct themselves or if the surgery would need to be setup. Shortly after the holidays, I noticed a decent size bump on my torso and was diagnosed with an umbilical hernia. That isn't such a problem but I couldn't get that surgery done if Christie was going to have to have her surgery. Lastly, my switch for my router broke, I ordered one from a parts supplier and received the wrong one so I pulled the router apart and effectively removed the switch from the circuit, there is a hand trigger that would keep it "safe" to use while waiting for the correct switch.
Finally, we found out that Christie doesn't need reconstructive foot surgery (yay!) and I had my umbilical hernia surgery done last week.
Tonight, when downstairs I didn't see that my circle cutting jig was scratching the baffles and I ruined 3 more, or at least marred them enough that I would never send them out that way. I am ridiculously embarassed and as stupid as I feel right now, I am even more angry at myself for wasting more money as I'll have to reorder some of these baffles until i have time to fix the repairs.
I offer this not as an excuse my tardiness, but just an explanation of the cluster that things have been like recently. I am sorry for being late, I will have two sets of baffles going to Ray (if Ray has the provisions to make a 1.5" through hole with a 1.875" 1/2" deep bore from the back side) on Wednesday to cut the port holes for Zilch and WiredBecker.
The other baffles have just been ordered and I will work on them Thursday providing they arrive by then and Saturday if I can't complete them (right now, i am working on things as I feel decent but obviously I couldn't concentrate enough to do them right.
All is not a total loss, when the weather breaks, I'll get these damaged ones sanded out in case there is a next round of this, although, at this point, I don't expect to be offering to do the routing again because of the gross incompetence I have shown.
Sorry again and thanks for the overwhelming patience.
Dave