First impressions
Now that I get to really examine these JBL's, I can really understand what needs to be done. First, the theaded rods running through them had to come out. They ran from top to bottom with big heavy steel bracing on the inside bottom. Then the holes need to be filled and sanded smooth, it's possible that I will reveneer the tops to make them perfect. For now they get putty so there is no leaks in the cabinets, the bottoms will just get sanded and painted black to match.
The cabinets have a few bumps and dings to address, but they mostly need some oil and rubbing. Woofers look good except for they need the usual refoam, which I already have the kit hear for that job. I will install an extra pair of the same models for the time being to get a listen to them. Then I will take out the crossovers to deox the switch, and also the L-pads.
Let the fun begin!
Now that I get to really examine these JBL's, I can really understand what needs to be done. First, the theaded rods running through them had to come out. They ran from top to bottom with big heavy steel bracing on the inside bottom. Then the holes need to be filled and sanded smooth, it's possible that I will reveneer the tops to make them perfect. For now they get putty so there is no leaks in the cabinets, the bottoms will just get sanded and painted black to match.
The cabinets have a few bumps and dings to address, but they mostly need some oil and rubbing. Woofers look good except for they need the usual refoam, which I already have the kit hear for that job. I will install an extra pair of the same models for the time being to get a listen to them. Then I will take out the crossovers to deox the switch, and also the L-pads.
Let the fun begin!
