Hifibythekg
Super Member
For measuring Vbe do I...
'Hook the positive lead from the multimeter to the to the BASE (B) of the transistor. Hook the negative meter lead to the EMITTER (E) of the transistor.'
and to what setting should the DMM be at?
- when set to diode /continuity testing.
Both the TR607 original 2SA844's read 692
Both the TR608 original 2SC458's read 688
- when set to DCmV
all transitors read 0.0 but flicker a bit at first.
'Hook the positive lead from the multimeter to the to the BASE (B) of the transistor. Hook the negative meter lead to the EMITTER (E) of the transistor.'
and to what setting should the DMM be at?
- when set to diode /continuity testing.
Both the TR607 original 2SA844's read 692
Both the TR608 original 2SC458's read 688
- when set to DCmV
all transitors read 0.0 but flicker a bit at first.